Cafe-Med.net

Construction Technology of Synchronized Crushed Stone Seal

 
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales
Sujet précédent :: Sujet suivant  
Auteur Message
happywork
ForuManiac
ForuManiac

Hors ligne

Inscrit le: 25 Aoû 2016
Messages: 2 263

MessagePosté le: 04/01/2017 07:39:44    Sujet du message: Construction Technology of Synchronized Crushed Stone Seal Répondre en citant

Safe Production
For the new entrants to three-level safety education and security technology to the end, please manage the company's new entrants to carry out safety training. Do not drink after work, non-operating sick, is strictly prohibited to fight. Construction site is strictly prohibited smoking, put an end to fire hazards, is strictly prohibited anywhere urine. Need to use power tools, there must be professionals to operate. Site electrician must cooperate with our mechanical and electrical sector on a regular basis to check the situation of field equipment to ensure that temporary electricity grounding, leakage protection, switch in place, effective. The construction of the working surface must pay attention to the setting and use of the site temporary electricity. The wires, electric boxes and wires must not be erected at the height that can not be touched by the staff. It is forbidden to touch the wires and electric boxes at all levels. Before using any electric motor, it is necessary to do no-load inspection and operate normally before using. All electrical equipment in the repair or move, you must power off before operation.
Civilization Construction
Construction site to set a clear, standardized, unified construction signage, indicating the name of the construction unit, the project profile, the project leader, safety management regulations; prohibit unrelated personnel to enter the construction site, the implementation of special parts of the work listed system; , Smooth, safe signs, complete facilities; construction personnel strictly enforce the operating procedures and the post safety standards, abide by labor discipline, into the construction site, strict labor wear system, the correct wear and use of labor safety equipment; construction process to strengthen safety and protection; Safety inspection, to ensure the safety of personnel construction. Site construction personnel to comply with the provisions of the construction site management of civilization, during construction during the day, pay attention to noise pollution, dust pollution.
asphalt used in road construction
hot tar crack filler equipment
electric concrete chain saw
floor cutter machine price
Revenir en haut
Publicité






MessagePosté le: 04/01/2017 07:39:44    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales Toutes les heures sont au format GMT
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Créer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2017 phpBB Group
Traduction par : phpBB-fr.com