Cafe-Med.net

shop floor workers

 
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales
Sujet précédent :: Sujet suivant  
Auteur Message
liuyi
Très Bavard
Très Bavard

Hors ligne

Inscrit le: 17 Oct 2016
Messages: 619

MessagePosté le: 29/12/2016 04:19:02    Sujet du message: shop floor workers Répondre en citant

2 must be staring at the shop floor workers use leftover bits of material. My home in the second day of the workers in the afternoon began to formal shop installs wooden floor thompson sealer products for composite decks , dry until 7 PM on the third day, and I'm just is on the third day at 4 PM didn't have time to go to the scene at the more, very regret, let workers sheet wasted a lot of finished product.
I found a great "like" workers conveniently use off-the-shelf products at hand plank to shop the fringes of the room, many leftover bits of material can be reused, but they don't think for you pressure treated wood effect outdoor wood wall pan... . When I go to found the problem is raised, the workers don't dare.
Nearly 200 yuan per square meter of real wood floor of my home ecological waste plastic product , and can use the plank to my house to pick up the 1 box, you said that the spirit is spirit.
__________________
Wpc Pool Deck
Revenir en haut
Publicité






MessagePosté le: 29/12/2016 04:19:02    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales Toutes les heures sont au format GMT
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Créer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2017 phpBB Group
Traduction par : phpBB-fr.com