Cafe-Med.net

supervise the construction

 
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales
Sujet précédent :: Sujet suivant  
Auteur Message
happywork
ForuManiac
ForuManiac

Hors ligne

Inscrit le: 25 Aoû 2016
Messages: 1 954

MessagePosté le: 15/12/2016 05:10:56    Sujet du message: supervise the construction Répondre en citant


wire in the tube kink, causing electrical problems. If workers to cut corners, will use a joint of wire or a few strands of wire wear in the same root PVC tube, once a problem occurs if the replacement is difficult. Reminder: the owner is best to buy their own


wire, and then supervise the operation of the workers in the field, the installation is completed after the electricity inspection. In addition, the owner must let the decoration company to leave a pipeline map. When the electrical wire buried just put into the wall,


the wall can be numbered and draw the planar graph, then to the wire and the specific location of strokes, indicate the distance from the ground floor, and the adjacent wall position, especially joint position indicated in the line, so that in the event of a failure,


composite decking suppliers in dubai

replacement wood slats for park bench new zealand

wood flower boxes decks norway
Revenir en haut
Publicité






MessagePosté le: 15/12/2016 05:10:56    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales Toutes les heures sont au format GMT
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Créer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2017 phpBB Group
Traduction par : phpBB-fr.com