Cafe-Med.net

The newly changed

 
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales
Sujet précédent :: Sujet suivant  
Auteur Message
happywork
ForuManiac
ForuManiac

Hors ligne

Inscrit le: 25 Aoû 2016
Messages: 1 845

MessagePosté le: 07/12/2016 09:37:04    Sujet du message: The newly changed Répondre en citant


attention to what? Xiaobian every family from the construction of the pre-construction drawings, wiring, switch installation, pipeline selection, etc. 16 aspects of detailed information on the installation of water and electricity knowledge. 1, the construction of the


construction drawings before the construction must have electrical (strong electricity, weak), water supply and drainage design and construction plans. 2, is strictly prohibited to wire the wire exposed without any protection directly to laying in the wall, floor,


under the floor or ceiling. 3, wiring line to distinguish between different voltage, different circuits, different signal lines are strictly prohibited to wear in the same threading tube. 4, the installation of lighting should be completed in the paint on the brick structure to


wpc all weather deck tiles grey picture

gym floors composite for sale

wood composite flooring dubai
Revenir en haut
Publicité






MessagePosté le: 07/12/2016 09:37:04    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales Toutes les heures sont au format GMT
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Créer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2017 phpBB Group
Traduction par : phpBB-fr.com