Cafe-Med.net

The company is located in

 
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales
Sujet précédent :: Sujet suivant  
Auteur Message
happywork
ForuManiac
ForuManiac

Hors ligne

Inscrit le: 25 Aoû 2016
Messages: 4 276

MessagePosté le: 14/06/2018 12:40:46    Sujet du message: The company is located in Répondre en citant

<PHome improvement inspection and acceptance is not just the final acceptance of the installation and construction results, because many home improvement processes are hidden works, to ensure quality and peace of mind, it is recommended that important construction nodes need to be accepted. The acceptance on strengthening the floor we are divided into primary inspection and surface acceptance of both. First of all, take a look at strengthening the basic points of floor pavement inspection.

<PBefore strengthening the floor pavement, ground grass-roots needs to be cleaned to ensure that no floating soil, no significant construction waste and so on. Before strengthening the floor pavement, the ground should be at or below the local balance of humidity and moisture content, non-wet construction. And to prevent the water from leaking to the ground, such as heating out of water, kitchen and bathroom interface and so on. General cement surface moisture content should be less than 2% (geothermal system should not be higher than 1.5%), the wooden floor should be 6% -10%.

<PAccording to requirements, the ground in the pavement, including laminate flooring, including the floor before the floor roughness to reach 2m by foot test should be less than 5mm. If the ground is uneven, you need to use tools to chisel, it is best to use self-leveling leveling process to ensure that the ground should not be uneven led to strengthen the floor after the installation of chipping, Qiqiao and other quality problems.

<PGround material should be high quality qualified products, and the orderly fixed on the foundation, not allowed to loose. Tap the ground with a screwdriver handle or hammer to check if the ground is empty and peeled off. If the ground is empty or peeled off, you will need to reprocess the ground. Otherwise, after laying the floor for a period of time, there will be noise because the ground is not solid.
"black wooden gates and fences,wood plastic composite questions and answers,weather proof exterior deck floor covering "
Revenir en haut
Publicité






MessagePosté le: 14/06/2018 12:40:46    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    Cafe-Med.net Index du Forum -> Pour Les Nouveaux Membres -> Règles Générales Toutes les heures sont au format GMT
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Créer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2018 phpBB Group
Traduction par : phpBB-fr.com